The structure was carefully backfilled. Then the Insulation watershed umbrella was added.
![]() |
The umbrella covered both the |
|
Rebar was placed in the butterfly notches, which were then grouted with waterproof, expanding grout to bind the panels into a single solid structure.
At least a foot of fill was pushed by the bulldozer over the umbrella to spread out the load of the machinery so that the umbrella would not be damaged. |
![]() |