|
A waterproof elastomer was rolled over the earth sheltered part of the structure.
The plastic tent over the garage in the background was used to keep the building warm so that the grout could cure properly during the cold Montana weather. |
![]() |
![]() |
Then the garage portion was waterproofed. |
Tour Navigation
<< PREV | HOME | NEXT >>
Start Tour | Precasting | Forms Details | Site Prep | Assembly | Joining Sections | Assembling Scoop | Waterproofing | Backfilling

